Colombia Onshore Upstream — CAPEX Benchmark
Regional Cost Dossier

Colombia Onshore Upstream — CAPEX Benchmark

Oil & Gas — Upstream & Offshore · AACE Class 5 · KPEX Cost Intelligence
€2,500 · one-time
Pay by card · immediate PDF delivery after payment

Report summary

Development CAPEX for 40 Colombian onshore oil & gas assets, re-expressed in a common price basis and location with the CAF Cost Index and CAF Location Factor — the defensible number a stage gate can attach to.

What's inside

Table of contents — 8 chapters
1Executive summary
2How the number is built
3Location Factor — Colombia
4The benchmark
5Asset map — by basin
6The 40 developments
7Field profiles
8Data quality, referential fields & sources
Figures & charts — 4
  • ▸CAPEX by basin (US$B, 2026)
  • ▸CAF Plant Cost Index (Z.5) — annual
  • ▸Unit CAPEX (US$/boe, 2026) — P10 / P50 / P90
  • ▸Benchmark cost curve (log-log, with project points)
Tables — 4
  • ▪Table 1 — Colombia location-factor drivers (Kpex Z.4): 12 institutional and socio-economic drivers with source, rating, percentile and factor.
  • ▪Table 2 — CAPEX by producing basin (2026 basis): number of fields and aggregate development CAPEX per Colombian basin.
  • ▪Table 3 — Asset register: the 40 Colombian onshore developments with basin, operator, oil gravity, recoverable reserves, escalated CAPEX and unit CAPEX.
  • ▪Table 4 — Principal sources.

What you get

📄 Branded PDF · A3 🎯 AACE Class 5 screening benchmark 📈 Live CAPEX·OPEX·ABEX lifecycle costing ⚡ Immediate download after payment 🔒 Proprietary — single-recipient licence