Kpex 2G  /  Module A
Module A

Process Plant Components

Parametric cost models for every component of a process plant — equipment, piping, fire & gas, instruments, electrical and civil works. In Kpex 2G each piece of process equipment comes together with its inside-battery-limits installation, shown graphically, on its way into a full AACE estimate.

Watch the sub-module videos Free with your work e-mail
How it works

What you get

Three outputs per component
Installed cost, weight and installation man-hours for every item, ready for a Class 5 or Class 4 estimate.
Sized by the cost driver
Capacity, power, area, diameter or volume — each model uses the variable that really moves its cost.
Material only where it is real
Alloy factors apply only to items built in alternative materials, such as vessels, pumps or piping; packaged items like turbines or motors are priced as supplied.
Prices current to the latest index
Every cost is brought to the latest month of the Kpex Cost Index automatically.
Metric or Imperial
Switch units in one click; prices do not change, only the way sizes are shown.
Equipment with its ISBL
Each piece of process equipment with the piping, instruments, electrical and civil works installed around it inside battery limits.
Drawn like a P&ID
The ISBL of each piece of equipment is drawn as a battery-limit schematic, with its material take-off priced line by line.
Ready to estimate your next project?
Join cost engineers using Kpex for AACE-aligned estimates worldwide.
Get Started