Products  /  Kpex 1G
First Generation · Component Estimator

Kpex 1G

The installed cost, the weight and the installation man-hours of any process plant component, in seconds. Pick the component, set its size, and Kpex 1G returns the three figures with their AACE Class 5 range — prices current to the latest Kpex Cost Index.

741
Component cost models
3
Figures per component
197
Countries in the Location Factor
±40 %
AACE Class 5 range
How it works

Three figures in four steps

1
Pick the component
Browse the Kpex work breakdown structure — equipment, piping, fire & gas, instruments, electrical, civil works — or search by name.
2
Set its size
The variable that really drives its cost: power, flow, capacity, area, diameter — or the standard catalogue size, with no interpolation.
3
Choose the options
Family, material of construction where the item is really built in several materials, installation condition and quantity.
4
Read the three figures
Installed cost (US Gulf Coast basis), weight and installation man-hours, with the AACE Class 5 range — in metric or imperial units.
Included tools

From the Gulf Coast to your project

Z.4
Location Factor — 197 countries
The CAF Location Factor Index to bring a US Gulf Coast cost to any country — used as a separate tool next to the estimator.
Z.5
Kpex Cost Index
Every catalogue price is automatically escalated to the latest month of the Kpex Cost Index; the index itself can be consulted to bring any historical cost to today.
Units
Metric or imperial
Sizes, lengths and weights switch between metric and imperial with one button; prices are unchanged.
Kpex 1G or Kpex 2G

A component in seconds, or a full estimate

Kpex 1GKpex 2G
What it answersHow much does this component cost, weigh, and take to install?How much does the whole project cost — and how sure are we?
ScopeModule A — 741 components, priced one by oneModules A, B, C, D, E and Z — components, benchmarks, facilities, operating cost, decommissioning and support tools
InstallationThe component’s own installation man-hoursEach piece of process equipment with its inside-battery-limits installation (ISBL), measured and explained
EstimatesSingle components, AACE Class 5AACE Class 5 to Class 2 estimates with WBS, revisions and reports
Location and escalationLocation Factor and Cost Index as separate toolsApplied inside each estimate
Discover Kpex 2G
Price your first component today
Kpex 1G is included in every paid plan, with a 14-day free trial.
See plans