ENGINEERING – HOME OFFICE DATABASE

ENGINEERING – HOME OFFICE DATABASE

ENGINEERING – HOME OFFICE

X11000 - ENGINEERING – HOME OFFICE MH – COST DATABASE

  • X11101 – ENGINEERING DESIGN – MANHOUR RANGE ALLOWANCE PER PIECE OF EQUIPMENT
  •  X11102 – ENGINEERING DESIGN – OTHER COST AS A PERCENT OF ENGINEERING LABOR DOLLARS
  • X11103 – ENGINEERING DESIGN – MANHOUR SPREAD PERCENTAGES
  • X11104 – ENGINEERING AND SUPERVISION PERSONNEL – TOTAL MANHOURS AS FUNCTION OF TOTAL DIRECT LABOR

  • X12101 – OFFICE PERSONNEL – TOTAL MANHOURS AS FUNCTION OF TOTAL DIRECT LABOR
  • X12102 – OTHER INDIRECT AND TEMPORARY CONSTRUCTION LABOR – TOTAL MANHOURS AS FUNCTION OF TOTAL DIRECT LABOR
  • X12103 – TEMPORARY CONSTRUCTION MATERIALS – TOTAL COST AS FUNCTION OF TOTAL DIRECT LABOR
  • X12104 – PAYROLL BURDENS AND BENEFITS AND OTHER INDIRECT MATERIALS – TOTAL COST AS FUNCTION OF TOTAL DIRECT LABOR


  • X13101 – PROJECT GENERAL MANAGEMENT – MANHOUR SPREAD PERCENTAGES

Includes the portion of time that the contractor's management staff applies in regard to overall direction of the project.

Copyright © 2018 by Carlos A. Fuenmayor R.

All rights reserved. No part of this publication may be reproduced, distributed, or transmitted in any form or by any means, including photocopying, recording, or other electronic or mechanical methods, without the prior written permission of the publisher, except in the case of brief quotations embodied in critical reviews and certain other noncommercial uses permitted by copyright law. For permission requests, write to the publisher, addressed “Attention: Permissions Coordinator,” at the address below.

Caf-Corporation US Inc.
11046 W Flagler Street;
Miami, Florida
33174
www.caf-corporation.com

Copy Protected by Chetan's WP-Copyprotect.